How much does it cost to build an app in Colombia?
Written and reviewed by Wilson Daniel Ospina, Founder & Lead EngineerUpdated
The short answer
At Zanacode, an iOS and Android MVP from a single codebase starts at USD 5,000 and takes 8–12 weeks, including publishing to both stores. That is the floor: the final number depends on how many screens and user types the app has, which outside systems it has to connect to, and whether hardware or AI is involved. Below is what moves the price, what keeps costing money after launch, and how to spend less without ending up with an app nobody uses.
What makes an app cost more (or less)
Two apps built on the same idea can differ in price by a factor of two. The difference almost always comes down to these factors:
- Screens and flows
- Every flow (sign-up, payment, chat, booking) is design, development and testing. Cutting a flow from the MVP is the most direct way to lower the price.
- User types
- An app with one kind of user is one app. One with a customer, a courier and an admin is three products sharing a database.
- Integrations
- Payment gateways such as Stripe, Wompi or PayU, maps and GPS, e-invoicing, or the ERP and CRM your company already runs. Every integration depends on someone else's documentation and uptime.
- Backend and admin panel
- If the app needs accounts, data synced across devices, or someone on your team managing content, it needs a backend. Users never see it, and it is one of the heaviest parts of the budget.
- Hardware, sensors and IoT
- Connecting the app to Bluetooth devices, industrial sensors or custom firmware is a different kind of project. That is why our embedded work starts at USD 9,000.
- AI
- An assistant, image recognition or recommendations. Adding an AI capability to a product that already exists starts at USD 4,000; building it into the MVP from day one adds to that MVP's scope.
- Design
- If you already have designs in Figma, development starts sooner. If not, UI/UX design as a separate engagement starts at USD 2,500.
Our starting prices
We publish the floor for every service so you can budget before talking to anyone. The final number comes from the scope, in writing, before development starts.
| Service | From | Typical timeline |
|---|---|---|
| Mobile Apps (iOS – Android - Web) | USD 5,000 | 8–12 weeks |
| AI & machine learning applications | USD 4,000 | 4–8 weeks |
| Embedded systems, firmware & IoT | USD 9,000 | 10–16 weeks |
| Strategic App Concepting | USD 1,500 | 1–2 weeks |
| Web Development | USD 4,000 | 5–8 weeks |
| UI/UX Design | USD 2,500 | 2–4 weeks |
Prices in US dollars (USD), excluding VAT and any withholding that applies in your jurisdiction.
Native, cross-platform or web: how the cost changes
A cross-platform app, built with React Native or Flutter, is written once and shipped to both iOS and Android. For the vast majority of MVPs it is the cheapest option, and it is what our starting price covers.
A native app (Swift for iPhone, Kotlin for Android) is worth it when the product needs deep operating-system features, heavy graphics or maximum performance. Two native apps cost more than one cross-platform app because, in practice, they are two codebases to maintain.
Sometimes you don't need an app at all. If your users come back once a month, a well-built web app (from USD 4,000) reaches more people and updates without going through the stores. If that is your case, we'll say so on the first call.
The costs that continue after launch
Building the app is not the only expense. Before you commit, budget for these:
- Apple Developer Program
- USD 99 a year, required to publish on the App Store.
- Google Play Console
- USD 25, a one-time fee to publish on Google Play.
- Servers and cloud services
- Usually small for an MVP, because most providers have free tiers to start. It grows with your user count and with AI usage, which is billed per use.
- Maintenance
- Apple and Google ship a new operating-system version every year, and over time the stores require apps to be built against recent versions. An app nobody maintains starts breaking or can no longer ship updates. Budget for regular updates, not just the launch.
- Taxes
- Our prices exclude VAT and any withholding that applies in your jurisdiction.
Freelancer, agency or studio: what you pay for in each case
A freelancer usually charges less, and for a small, well-defined project that can be the right call. The risk is everything one person can't cover: design, backend, store publishing, and what happens to your app if that person becomes unavailable.
A large agency covers all of that, but the price also pays for its sales structure, and the project often passes through several hands before it reaches the person writing the code.
We are a small studio in Medellín that designs, builds and ships its own apps: Novac, Apateon, Acemate and others are in the stores today. What we quote you is the same work we do for ourselves.
How to spend less without ending up with an app nobody uses
- Start with a discovery sprint
- For USD 1,500 you get a written spec, a scope and an estimate that are yours, whether or not you build with us. Finding out a feature is unnecessary is cheaper on paper than in code.
- Launch with one core feature
- The MVP exists to prove someone uses the app. Everything else can wait for version two, informed by real users.
- Use services that already exist
- Payments, sign-in, notifications and maps already exist as services. Building them from scratch is almost never worth it in an MVP.
- Ask for a fixed price
- We agree on scope and price in writing before starting. If discovery shows the project is bigger, you get the revised number before you commit, not an invoice afterwards.
What fits in an MVP
For real-world sizes, look at the apps we've already shipped: an offline logbook for oil and gas field crews, a personal finance app, an online social deduction game, and a jewellery catalogue that takes orders over WhatsApp. See the apps we've shipped →
App cost FAQ
- How much does an app developer charge in Colombia?
- It depends on whether you hire a person by the hour or a whole project. We quote per project at a fixed price: an iOS and Android MVP starts at USD 5,000. Charging per project rather than per hour keeps the estimation risk on our side, not yours.
- How long does it take to build an app?
- A mobile MVP takes 8–12 weeks from kickoff to store release, and a project with hardware or IoT takes 10–16 weeks. Apple and Google review can add a few days at the end.
- Is it cheaper to build an app in Colombia than in the US?
- Usually, yes. And Medellín shares working hours with US time zones, so you collaborate in real time instead of waiting overnight for answers. Our published floors let you compare like for like before the first call.
- What does the starting price for a mobile app include?
- Design, iOS and Android development from a single codebase, API integration, analytics, and publishing to both stores. It does not include the Apple and Google developer accounts, which are paid directly to each store.
- Can I build an app for free or with no-code tools?
- To validate an idea, yes: no-code tools work for a prototype. The limits show up when you need performance, custom integrations or full control of the product. If you already tested the idea that way and it worked, that prototype is a great starting point for discovery.
Want the exact number for your app?
Tell us the idea and we'll reply with a fixed scope and price in writing, before any work starts.